![]() The first production run of T-51b suits were sent to China in June 2076. Gyroscopic stabilizers and shock absorbers were subsequently added to rectify the situation. ![]() A prototype tested in September 2075 had the desired mobility and protection but landing tests proved the armor lacked stability. The development of T-51b prototypes hastened two-fold as the T-45 models struggled in mainland China, with production models tested in combat conditions at Fort Strong in Massachusetts. ![]() The company partnered with the United States government, and by 2069, the T-51b model served as their largest contract. Following the successful deployment of the first operational power armor in 2067, the T-45 power armor model, West-Tek began development on an improved model.
0 Comments
Leave a Reply. |